# AI demand is driving semiconductor reshoring more than incentives

Markdown copy of https://realalpha.app/s/ai-demand-is-driving-semiconductor-reshoring-more-than/ on Real Alpha, the best minutes from long interviews with the people building AI. Cite and link the page, not this copy.

- Speaker: [Steve Tusa](https://realalpha.app/people/steve-tusa/) · Steve Tusa is an industrials analyst at Wells Fargo.
- Host: [Steve Eisman](https://realalpha.app/people/steve-eisman/)
- Show: The Real Eisman Playbook
- Episode: [The Industrials Riding the AI Data Center Boom with Steve Tusa | The Real Eisman Playbook Ep 85](https://realalpha.app/v/cTZ_eF8GkjY/), Nov 23, 2026
- Moment: 19:15 to 22:18 of the episode (3 min), playing on https://realalpha.app/s/ai-demand-is-driving-semiconductor-reshoring-more-than/; the episode from there: https://realalpha.app/v/cTZ_eF8GkjY/?t=1155

## Quote

> “The semiconductor side, though, that part of the economy, they are continuing to **onshore aggressively there**.”
> — [Steve Tusa](https://realalpha.app/people/steve-tusa/) at [20:00](https://realalpha.app/v/cTZ_eF8GkjY/?t=1200) · The Real Eisman Playbook

## Takeaways

1. Life sciences projects total about $35–40 billion in the current pipeline.
2. Semiconductors have about $250 billion of projects that could move the needle.
3. Power and HVAC suppliers are adding capacity to serve data center demand.

## About this segment

Steve Tusa says life sciences construction is modest beside AI spending, while semiconductor investment is accelerating because of undersupply. He also points to new electrical and HVAC capacity being built for data centers.

From “The Industrials Riding the AI Data Center Boom with Steve Tusa | The Real Eisman Playbook Ep 85”, Nov 23, 2026. [Watch the full episode](https://realalpha.app/v/cTZ_eF8GkjY/)

## Transcript

Transcribed by machine (Whisper) from the episode’s audio, so a word may be off here and there.

[19:18](https://realalpha.app/v/cTZ_eF8GkjY/?t=1158) Is there any evidence that factories are being onshored? In two areas. Okay. One that is not quite big enough to matter, that would be life sciences. That is happening. What is life sciences exactly? Life sciences or pharmaceuticals. Pharmaceuticals. Yeah, I call it life sciences because the companies- Labs, pharmaceuticals, stuff like that. Yeah, single-use drugs, all that kind of stuff. And you say that's not big enough to matter. Why?

[19:42](https://realalpha.app/v/cTZ_eF8GkjY/?t=1182) The current pipeline there, when you look at the starts and the potential plants being built, it's about $35 billion to $40 billion. We're talking about AI spending of... $850 billion, at least. Yeah. Next year, $1.4 trillion, right? So, this is just not a big mover. The semiconductor side, though, that part of the economy, they are continuing to onshore aggressively there. I think AI and the demands of AI, before it was government incentives, the demands of AI are now accelerating that process.

[20:20](https://realalpha.app/v/cTZ_eF8GkjY/?t=1220) They don't need the government incentives. There's just massive undersupply. And so, if you look at the inflection, there's about $250 billion of Project Pipeline. That can move the needle, because that's going to happen in the next two years, it's going to happen quickly. But it's semiconductor. It's semi. So, it is, again, AI-related. AI-related. But let me ask you a question. Trump passed this bill that, basically, if you build a factory in the United States, you get to write 100% of it off.

[20:47](https://realalpha.app/v/cTZ_eF8GkjY/?t=1247) Yeah. From what you're telling me, it's really not had much impact. We haven't really seen a lot of that. I mean, the bottom line is, do you have enough capacity, and is there enough demand for whatever supply you're bringing on, especially when there's inflation, and the last thing you want to do is really tip over the apple cart on supply demand. Where there is capacity being added is in the electrical supply, the power supply, and the HVAC supply. There's observable 16 million square feet of announced electrical and power-related new capacity that has been announced out there to supply this $20 billion of extra electrical stuff for these data centers. This is very healthy for the economy.

[21:40](https://realalpha.app/v/cTZ_eF8GkjY/?t=1300) This is real stuff, and it's real jobs, and it's real... This is not financial engineering. No, no. Well, who knows what it's like. Well, you know, that's not a story, but real stuff is being built. Yeah, yes. How it's being financed, we could have another discussion about it. But that's, yeah, I'm probably not necessarily the guy to talk about that, but as far as the on-shoring, hey, I'm just going to bring it back because of tariffs or something.

[22:04](https://realalpha.app/v/cTZ_eF8GkjY/?t=1324) That's not happening. It's pretty incremental. Right, okay. There was something you sort of intimated at before, so let's talk about it. I mean, 3M is a good, nice barometer on the broader economy. Yes, definitely.
