# Reliable power can attract investment and speed construction

Markdown copy of https://realalpha.app/s/reliable-power-can-attract-investment-and-speed-construction/ on Real Alpha, the best minutes from long interviews with the people building AI. Cite and link the page, not this copy.

- Speaker: [Kristian Ruby](https://realalpha.app/people/kristian-ruby/) · Kristian Ruby is a secretary general of Eurelectric. · Leads Eurelectric, the federation representing more than 3,500 European utilities across power generation, distribution and supply.
- Host: Akshat Rathi · Reporter, Bloomberg
- Show: Zero: The Climate Race
- Episode: [The big questions over European electrification | Zero: The Climate Race](https://realalpha.app/v/Sx4pxGPbJew/), Oct 29, 2026
- Moment: 17:35 to 20:42 of the episode (3 min), playing on https://realalpha.app/s/reliable-power-can-attract-investment-and-speed-construction/; the episode from there: https://realalpha.app/v/Sx4pxGPbJew/?t=1055

## Quote

> “Germany was able to mobilize and build an LNG terminal, I think, **within six months**.”
> — [Kristian Ruby](https://realalpha.app/people/kristian-ruby/) at [20:06](https://realalpha.app/v/Sx4pxGPbJew/?t=1206) · Zero: The Climate Race

## Takeaways

1. Finland is adding barriers, transformer protection and drone nets.
2. Google and Fortum announced a $13 billion investment.
3. Germany built an LNG terminal in six months after the invasion.

## About this segment

Kristian Ruby points to Finland’s protections and a $13 billion Google-Fortum deal as evidence that resilience can draw investment. He also cites Germany’s six-month LNG terminal build as an example of how quickly projects can move when urgency is clear.

From “The big questions over European electrification | Zero: The Climate Race”, Oct 29, 2026. [Watch the full episode](https://realalpha.app/v/Sx4pxGPbJew/)

## Transcript

From the transcript Zero: The Climate Race publishes with the episode.

[17:38](https://realalpha.app/v/Sx4pxGPbJew/?t=1058) First of all, I wouldn't sort of overstate the additional cost. I think these are the type of costs that you cannot afford not to have. You will want to have reliable power. That is a critical precondition for an electrified society. And I think what we need to do is really to stack it up against the alternative, which is continued dependence on supplies of fossil fuels from the outside that we have no control over and which frankly looks more and more difficult in the near and medium term. So we need to reinforce our system. And again, you know, coming back to the example of Finland, which is really interesting here, they are doing many of these things. They are essentially building system level two protections. That means concrete barriers, protections around transformers, drone nets, etc.

[18:25](https://realalpha.app/v/Sx4pxGPbJew/?t=1105) etc. And it's not a barrier for new investment. You'll know of the Google deal from a couple of weeks ago where Google invested $ 13 billion in a cooperation with Fortum, the Finnish utility, the biggest ever investment made. What the hyposcalers are after is reliable, immediate access to power and clean power if possible. And if they can get that, the price matters less. Building a resilient system is not a barrier. for investment. On the contrary, it is a precondition.

[18:59](https://realalpha.app/v/Sx4pxGPbJew/?t=1139) And I think right now, what we're seeing in the next probably 12 to 18 months, I believe we'll see a new wave of data center projects emerge in Europe as the hyperscalers are meeting increased resistance in the US. They will look towards the European market for additional build-out.

[19:16](https://realalpha.app/v/Sx4pxGPbJew/?t=1156) Beyond the cost side, there's another challenge that Europe and the US continue to face, which is just the inability to build what is needed. You need to build more solar, more wind, more transmission, more batteries. But you also need to be able to build data centers and EV charging network. And all of that comes with challenges to convince people that this is infrastructure that would be in their benefit.

[19:44](https://realalpha.app/v/Sx4pxGPbJew/?t=1184) Are there places in Europe where the sort of permitting issues the building and the pace at which things can be built have been overcome that others can learn from?

[19:55](https://realalpha.app/v/Sx4pxGPbJew/?t=1195) Yeah, I think there are those examples. And I think it's important to say that if the urgency is there, we can do things very fast. If you take a step back and look at what happened in the immediate wake of the invasion of Ukraine, Germany was able to mobilize and build an LNG terminal, I think, within six months. And, you know. Normally, we would think of this as an infrastructure project for six years, if not 10. So it is possible if we essentially take the situation that we're in sufficiently seriously.

[20:26](https://realalpha.app/v/Sx4pxGPbJew/?t=1226) I think it's well known that Europe has sort of tied itself up way too much in red tape. And we are on a sort of multi-year mission to try to sort of simplify this, make it easier, make permitting flow more freely and make it happen faster.