Spend to hedge decisions that cannot be reversed
Chris Power explains how Hadrian balances long equipment lead times against the cost of getting a decision wrong.
The episode’s best minutes
Full analysis- 4:39Shared capex lets Hadrian bet on multiple demand signalsPro pick 4 min
- 13:30Spend to hedge decisions that cannot be reversed7 min
- 28:10Hadrian forced a vendor to fix rusting machines in four weeks4 min
- 4 more moments in the full episode
“you're better off spending 30 more to bake in hedges because the one thing you can do is”
Chris Powerat 15:27 · RelentlessTakeaways
- Separate irreversible equipment choices from reusable components.
- A delay can be costlier than modest extra capex.
- Build slack into foundations and electrical infrastructure.
About this segment
Chris Power explains how Hadrian balances long equipment lead times against the cost of getting a decision wrong. The same logic leads them to overbuild foundations and electrical drops to preserve options.
Chris Power is founder and CEO of Hadrian.
Founded Hadrian to build AI-powered factories combining software, robotics and manufacturing to rebuild America’s industrial base.

Ti Morse, Host · Host, Relentless
Interviews hard-tech founders on Relentless; guests include Sam Altman, Brian Armstrong and Hadrian's Chris Power.
From “How to Dominate Manufacturing in the US | Chris Power, Hadrian”, Sep 21, 2026. Watch the full episode
Thanks. We'll look at and fix what's off.
Transcript
Transcribed by machine (Whisper) from the episode’s audio, so a word may be off here and there.
- 13:36
in order to maintain a high pace i think about it in two modes one is um and it's mostly about time and i'll give you a practical example and we try to teach the same all the time so let's say you're building a automated welding line and you have to deliver a working prototype in month 10 but your capex lead times are nine months and to be a hundred percent accurate around what robot is it what's the station look like is it the right weld um it's gonna take you three months best team in the world it's gonna take you three months okay that doesn't work because then you're in month 13 so how do you hit the timeline while minimizing the risk hedges of of what you can't control which is time the answer is if you break down that automated welding station maybe it's a million dollars maybe 800 grand is single skew things like the particular machine
- 14:44
and the rest of it is a robot arm a couple other things if you're running a big platform like hadrian what you can do is say hey guys you need to spend three weeks out of four weeks being 100 sure that this big block of capex is 100 because that you can't change that but let's hash in a rough idea of what robot arms are going to fit and if you're wrong it's going to cost us 50 grand because we have to reuse the robot arm for something else but if you miss the timeline the company's dead because the customer cancels the contract so you got to think about it as capex capex and long engineering projects are all one-way doors and you're better off spending 30 more to bake in hedges because the one thing you can do is shit we ordered all the capex and we got some of the engineering predictions wrong so it cost us three weeks because we screwed up an api integration or okay
- 15:49
that happens all the time but then you're three weeks late what you can't do is order nine months worth of capex it arrives and on nine months and day one you Realize you're wrong, and then you're at 18 months risk. So you have to balance execution timelines against bets. But if you're dealing with the thing about software or sales or whatever is it's bad to miss a month, it's bad to miss a quarter. But you can recover from it because you can observe the problem and then pivot. And your correction time is maybe, maybe, maybe, maybe you burnt 10 million in runway, but you can you can can pivot capex is a whole different ball game and if you don't have 100 certainty the capex you're buying is correct then you have to hedge and then you have to financialize that hedge across different trade spaces so that's that's the way we think about it um the second most
- 16:49
important way is one of my favorite lines of all time is sometimes you just gotta roll a hard six what does that mean it means that sometimes actually most of the time you just got to be right and in businesses where you're dealing with long correction timelines you just have to be really fucking good and one of my this is one of my favorite tv shows of all time is battle cycle galactica and you're fighting an asymmetric war and you don't know what's going on and everyone's like well you know we gotta we're gonna go raid this fuel depot and all and the opposing force is 10 times bigger and you know you're gonna risk a lot of fighter jets going getting this you know fuel for the battle star and everyone's like well we're gonna lose you know it's it's very risky it's super asymmetric it's never going to work but the option space is basically you don't do it
- 17:54
you don't win and you run out of fuel or you just win and you got to roll a hard six and you got to you know like in in in dungeons and dragons it's a natural 20 so mostly the right attitude is there's no way to manage this you just got to roll a bunch of hard sixes and if you once you understand that that is the business that's fine but there are no one-way or two-day doors there are only one-way doors and then you got to get very good at doing that and understanding the difference between something that you can fix later and something that you're not going to be able to fix later I'll give you a great example so usually when you're constructing a factory you want to have a very good design and layout and the layout determines your construction costs because some parts of the layout you need
- 18:51
very expensive foundations and electrical, clean rooms, et cetera. If you're moving fast, you're not going to have the perfect layout. You want to really think it through because whatever the layout, like once you land the CapEx, it's stuck. And a lot of factory layout determines your operating efficiency in weird ways. Travel time, sure, but like where people communicate and stuff like that. what the way one of the ways we think about it is okay the one of the longest poles in factory bring up is literally where the electrical drops and where the foundations are now if you want to aim for perfection maybe you don't have to lay 20 inch concrete vibration isolated foundations everywhere but if you want to kick off construction tomorrow you're better off spending $25 million on foundations instead of $15 million so that you're buying your layout
- 19:47
team four months worth of simulation time and they can put the capex wherever they want. And that is a calculation of terminal efficiency value of that factory. So we overinvest in things like, we're going to do electrical drops everywhere. And the reason why we do that is you can pay an electrical contract to do electrical drops everywhere. And you're not going to use 30% of them. That's kind of counterintuitive. But one, they can just do mass electrical drops in two weeks, bang them everywhere. And then a, you know, a manufacturing engineer can connect an electrical drop to a machine. So you want to arbitrage the very expensive lock in things, while not waiting for long lead decisions like foundation build outs or capex selection and you have to