Compute supply is tight and contracts require large bets
Tuhin Srivastava describes running clusters at mid-90s utilization across 18 clouds, then explains the contract terms needed for scarce GPUs.
The episode’s best minutes
Full analysis- 18:32Compute supply is tight and contracts require large bets5 min
- 13:04Customers should prove value before investing in custom modelsPro pick 6 min
- 33:42Founders should hire leaders who can own whole problems3 min
- 5 more moments in the full episode
“we have 90 clusters around the world across 18 different clouds.”
Tuhin Srivastavaat 19:20 · No PriorsTakeaways
- Baseten runs 90 clusters across 18 clouds.
- Good providers are scarce, even when capacity exists.
- B200 deals can require 3–5 years and 20–30% prepayment.
About this segment
Tuhin Srivastava describes running clusters at mid-90s utilization across 18 clouds, then explains the contract terms needed for scarce GPUs. Access to capacity also depends on operational reliability and capital.
Tuhin Srivastava is cofounder and CEO of Baseten.
Co-founded Baseten, an AI inference company powering mission-critical workloads for Writer, Abridge and Bland.
From “Baseten CEO Tuhin Srivastava on Custom Models, and Building the Inference Cloud”, May 1, 2026. Watch the full episode
Answers “Is there still a GPU shortage?” See all 95 answers
Thanks. We'll look at and fix what's off.
Transcript
Transcribed by machine (Whisper) from the episode’s audio, so a word may be off here and there.
- 18:37
You started with unifying capacity across all the clouds and neoclouds. How do you think about this when everybody keeps talking about a supply crunch and a multi-year supply crunch? I think there's so much narrative around the supply crunch. And no matter, as much as we hear about it, I don't think people realize how bad it really is. Like there is, you know, there is very, very little Slack compute available.
- 19:06
Like, you know, we run pretty large clusters ourselves and we run them in like uncomfortably high utilization. You know, when I'm saying we're like mid-90s utilization most of the time. There is, we have made, we have, we sit in 18 different clouds now. we have 90 clusters around the world across 18 different clouds. And like, you know, initially we started, we like built this technology to be able to like kind of create one runtime fabric that spans all these different clouds and try to abstract that away from our customers as a way to think about reliability, latency, failover, all these things that we think are going to be very important for very mission-critical use cases.
- 19:48
That same technology, like just our ability to get compute wherever humanly possible has been really, really helpful in our ability to get supply. And what I mean by that is is we can be introduced to a new provider in a different country and have it up and running with the whole base 10 inference stack. As part of the fabric. Part of the fabric in half a day, maybe less. And that gives us enormous flexibility.
- 20:22
Even for us, it is hard for us to grow. We have a, we have a, I think that's, yeah. We have a, a 4 p.m. standing meeting for the company where we basically like, like, how do we, like, how do we, how do we manage capacity for the demand right now? I think the second part, which people don't really, the two, the second part that people don't really understand is that there are also a lot of suppliers right now that it's kind of grifty you know like i i think you know they haven't run they haven't run data centers before you know they don't understand slas especially for inference um and so like you know even when there is capacity available um there's a lot of deal like there's probably we we run a lot more and we have redundancy so it's fine but if you you know there's probably like a dozen good like clouds and i'd probably like put like three or four of them in like the
- 21:26
the gold tier um and i think that just means that like supply like not only are we supply crunch we're supplier and operationally crunched onto people who can who can run these data centers as well so how far ahead can you actually buy capacity right now in other words like is there any Slack in the market if you buy two years ahead or five years ahead. You mean like contract length or actually like, hey, I want this in January 28th?
- 21:54
Yeah, either one. I mean, it's more the, I want this in January 28th or at least I have some visibility into my future supply. Yeah. You could buy that, but you got to also remember how quickly the market is moving. And like, you know, that gets balanced somewhat off like the fact that the h100 is such a great chip um and like and then you know it's crazy it's four years four and a half years old the price is going up still yeah maybe has a useful life nine years yeah um so um you know that that's that's good but at the same time at the same time you know yeah You can do that, but you're making a lot of bets as part of that.
- 22:37
And then in terms of, I think that's the big thing that's changed over the last six months is that the term length that people want has just gone up. So if you wanted 1,024 B200s, which is from a good cloud, right now you're not getting that less than a three to five year contract right now with probably a 20 to 30% TCV prepay. So like actually what becomes important when acquiring capacity is you need to have enough demand to supply it, to serve it, but then you also need like a low cost of capital, which is actually changing the dynamic pretty significantly.
- 23:20
Does that impact how you think about