Try Pro free

TBPN · 6 min · Nov 3, 2026

Northwood's raise followed orbital validation and production readiness

Bridgit Mendler says the round followed orbital validation, rapid fielding and 29 units built across two runs.

In this episode

Full analysis
  1. 58:34Industrial AI value comes from faster engineering loops5 min
  2. 26:47AI agents make product details and shopping history matter3 min
  3. 1:10:34xAI needs compute revenue to fund its expansion2 min
  4. 41:00Northwood's raise followed orbital validation and production readiness6 min
  5. 30:32AI shopping depends on richer product attributes6 min
  6. 36:46Agentic orders keep Shopify's standard merchant fees for now3 min
  7. 8:00Google can absorb search declines if its other businesses hold up3 min
“We have produced at this point 29 units of hardware across the products.”
Bridgit Mendlerat 41:57 · TBPN
41:57

Takeaways

  1. Portal and Prism were validated from LEO through geostationary orbit.
  2. Northwood built 29 hardware units across two production runs.
  3. Its scaled-up facility is designed to produce hundreds of antennas.

About this segment

Bridgit Mendler says the round followed orbital validation, rapid fielding and 29 units built across two runs. A 185,000-square-foot facility is ready to produce hundreds of antennas.

Bridgit Mendler

Co-founder & CEO, Northwood Space

Co-founded Northwood Space, building shared satellite ground infrastructure; earlier a Disney Channel actress and singer.

  • John Coogan, Host · Co-host, TBPN

    Co-founded Soylent and Lucy; OpenAI bought his show TBPN in April 2026.

  • Jordi Hays, Host · Co-host, TBPN

    Founded Branded Native; co-founded fintech Capital, which Rho bought.

From “$AAPL + $PLTR, GDPx, Value of a Search, Grok Bot Breaks the Bank”, Nov 3, 2026. Watch the full episode

Transcript

Transcribed by machine (Whisper) from the episode’s audio, so a word may be off here and there.

  1. 41:07

    Thank you. Thank you very much. And you talked last time, but what was the key unlock? Is it technology milestone, financial milestone? What really unlocked this particular fundraise? I mean, we're asking ourselves a series of questions. The first one is, like, can the tech do what we say it can do? So we have the two products. There's Portal, which is our C2 product, and then there is Prism, which is the high-throughput product.

  2. 41:34

    We've now validated them across not just LEO orbit, but all the way up to geostationary orbit. And the real thing that matters for us is that capability, demonstrating it, but also on a timeline that is relevant. So we were able to turn that capability around, get it fielded in a matter of days. So it's basically, you know, can we perform at speed and can we actually hit the performance specifications that we are saying we can do?

  3. 41:58

    And then at that point, it's a question of scale. Have we kind of proven to ourselves that we can actually scale this product? We have produced at this point 29 units of hardware across the products. We've done two production runs. We're now in our bigger scaled up facility, 185,000 square feet, that's ready to produce hundreds of antennas. And so we kind of convinced ourselves we were ready for that scale.

  4. 42:18

    And then ultimately, it's been, you know, a tremendous year for the space industry in terms of just validating the original Northwood premise, which is the volume and data is going to go up by a lot. So, yeah, we were ready for the next milestone. Super impressive. And then demand, like demand side, like what's going on on that front? Like, I'm assuming a lot of it's still like kind of, hey, if we do this thing, like, will you give us a lot of money?

  5. 42:44

    And so far, it seems like the answer is yes, but break that down. Yeah, I mean, there's the whole range from a lot of net new signed customers as well as exactly what you're saying, which is huge amounts of demand as new customer sets are examining space fresh for the first time on the commercial side, but also on the government side, just huge waves of funding and programs that are becoming more solidified.

  6. 43:07

    So all of those things at the same time and a lot of different customer priorities, but that's what we're built to support. Are you thinking about the breakdown of different opportunities in space? Obviously, there's a lot of satellite internet traffic. That's so exciting. There's imagery that's happening. There's also AI potentially happening, but unclear how bandwidth heavy that will be. And then just yesterday, SpaceX announced Starfall doing microgravity experiments for bio.

  7. 43:42

    I have no idea how bandwidth constrained those types of experiments are, but what's on the horizon that you think will either be uniquely unlocked by Northwood or just be another tailwind for you? Yeah, I mean, exactly. Like the industry is diverse. And frankly, like that's what we think is really. important in what we're solving for. So the way that we've designed our product is so that we can fit as many industry use cases into Portal and Prism, our two product lines, as possible.

  8. 44:09

    And so when we're looking at those use cases that are coming up and are interesting, the kind of like overall customer requirements that are customer features that align with us, is it a customer that cares about scale? And is it a customer that cares about reliability? Like these are customers that are managing constellations that need to hit that scale on aggressive timelines, but also really assure high levels of uptime that historically third-party ground has not been able to offer. So that is things like comms. Comms is a use case that has a particular amount of pressure there. And I think, as you said, pushing into higher and higher throughputs is a really exciting problem. And for me, I think that's especially exciting as we talk about overall volume of data and space becoming more important. But use cases like you

  9. 44:54

    described, whether it's Starfall or others on the actual lower bandwidth side are also tremendously exciting. And it's also a very key national security priority. Um, so yeah. Uh, on the national security side, what's the supply chain look like? I was, I was reflecting on the fact that the, the new iPhone, I think we're on eight 18, it's been almost 20 years. I think this one is the first one that has an Apple modem in it. They finally moved onto their own, uh, their own hardware stack. And I'm wondering like, uh, are you, are you supply constrained in any way? Or Or are you thinking about, I don't even know what goes into building a ground station.

  10. 45:29

    Are there rare earth magnets or is it just metal and aluminum or licensed technology and IP from like Qualcomm or some other company? Like, what does that supply chain look like? I imagine you're not bottlenecked right now because you're still growing the company. But what's coming down the pipe? I mean, I don't think there's a single hard tech company that is not supply chain impacted. It's just like, what are the strategies that make sense for the company to address that?

  11. 45:53

    And I'd say that's where the new capital comes in. We're at a stage now as a company where we're making, you know, different sets of decision calls about how we can scale up production, whether that be deepening vendor relationships. So, like, we've had some relationships we've been building since day one with vendors that are non-traditional to these space problems. And really, now we can indicate higher levels of volumes, which helps gets us, you know, special engagements with those partners. So that's great.

  12. 46:19

    But also, we're at this point able to implement bringing more things in-house. So we're also doing that strategically with a whole wide range of pieces of our stack for exactly the reasons that you mentioned. And then also sometimes, whether it be for like a performance or cost reason, but also, you know, any areas where we're kind of pinned down by vendors' timelines, that's where we seriously consider insourcing.