Boom uses vertical integration to speed up engineering
Blake Scholl says waiting months for parts forced Boom to bring manufacturing in-house.
The episode’s best minutes
Full analysis- 2:56Boom uses vertical integration to speed up engineering4 min
- 7:52Modular turbines could ease data center power constraintsPro pick 6 min
- 23:38Boom plans to make single-crystal blades in a digital foundryPro pick 2 min
- 3 more moments in the full episode
“You can't iterate with a supply chain. Anything that's in the iteration loop of the product, you got to vertically integrate.”
Blake Schollat 5:44 · MTSTakeaways
- Boom coined a slacker index: delivery time divided by manufacturing time.
- Some three-day parts took 18 months to arrive.
- Parts in the iteration loop need to be made in-house.
About this segment
Blake Scholl says waiting months for parts forced Boom to bring manufacturing in-house. Engineers and machinists can now iterate together, both digitally and on physical parts.
Blake Scholl is founder and CEO of Boom Supersonic.
Founded Boom Supersonic and led XB-1, the first independently developed jet to break the sound barrier.

Theo Jaffee, Host · Co-founder & host, MTS
One of the first members of a16z's new media team; earlier hosted the Emergent Ventures-backed Theo Jaffee Podcast.

Sophia Dew, Host · Host, MTS
From “Traditional Aerospace Supply Chains Are Cooked | Blake Scholl”, Oct 23, 2026. Watch the full episode
Thanks. We'll look at and fix what's off.
Transcript
Transcribed by machine (Whisper) from the episode’s audio, so a word may be off here and there.
- 3:03
Tell me a little bit about the timelines here. Like, how are you guys able to move that fast? Yeah. So give a little bit of the short answer is vertical integration plus an incredible team. So let me unpack that. So this engine is built by the same team that built our XB-1 supersonic aircraft. So this is the airplane that broke the sound barrier last year, proved that sonic boom didn't have to be a thing, resulted in legalization of supersonic flight.
- 3:30
And when we built that airplane, we really built it to learn. And we probably learned 10 times more than we thought we would. And one of the biggest lessons learned was that the traditional airspace supply chain in this country, I have no polite words for it. Let's just say it sucks. And so we found that oftentimes our engineers and our technicians spent more time waiting for parts than they did designing, assembling, and building.
- 3:58
And so, in fact, we coined a term we call the... slacker index. What's that? So the slacker index is how long it takes to get something divided by how long it actually takes to make it. And there were things that would take three days to manufacture, but take 18 months to get, as an example. And it's just insane. And sometimes the costs were insane. And there's nothing slower than an engineer who doesn't want to break a part that's hard to replace or make a decision that if it goes wrong, we'll have a safety implication.
- 4:31
And so as we, you know, 18 months ago, we said, okay, we're done with that airplane. We said, let's take a moment and think about everything we learned, not just about the airplane, but how you build complicated, large things. And we decided it was time to go vertically integrated. So not just designing the engine ourselves, but actually making the parts too. And so the building I'm standing in here is our R&D factory.
- 5:00
And we sort of prototype that process to build this engine. So literally on that side of the building over there, we take in raw materials. It goes to a sort of a, call it an R&D scale machine shop where we can do everything from machine turbine cases to the drive shafts that hold the whole thing together. to the veins and blades that kind of shape the airflow. And so what we found was the team was just loving that way of working and problems that would have taken weeks or months to resolve before when you have engineers, machinists, technicians, all working together, like not across a Zoom call, not across time zones, but like literally right there, look at the parts together.
- 5:47
You can move super quickly. And if you need to iterate, so that's the other thing. You can't iterate with a supply chain. Anything that's in the iteration loop of the product, you got to vertically integrate. Otherwise, it just takes too long. And when it takes too long to iterate, then people start making very conservative engineering choices. You can't try anything new. Because if you get it wrong, you got a big setback to wait on a supplier.
- 6:10
So this is a relatively traditional architecture for a turbine. It's a six-stage high compressor, stainless steel, nickel super alloy, blah, blah, blah. I could keep going. But there's other things out there that have all those words in them. But the way this was engineered and the way it was built is radically different. We build our own engineering tools that allow a small team to run simulations in real time.
- 6:38
You can literally drag a slider and change a design variable, like how tall is the blade and what's the twist angle and what shape is the air for. You can drag a slider for those things. we can run a simulation in real time and then the engineer can see how it affects the engine. And this used to be like hundreds of engineers in months. So you can iterate, iterate, iterate digitally. But if you don't have your own manufacturing, you can't do the same thing physically and then you grind to a hole.
- 7:03
So it's all about iteration. Iteration in the digital world and then iteration in the world of atoms as well. I want to shout out our sponsor, Lovable.